Brickhouse Security Livewire Volt GPS Tracker for Vehicles, Hardwired Car Tracking Device with Real Time Location & Speed Alerts, 4G Cellular Vehicle GPS Monitoring System, Subscription Included

★★★★★ 4.1 23 reviews

$149.95
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by democodigos.pollafutbol.co
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$149.95
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives May 9
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by democodigos.pollafutbol.co
Free 30-day returns Details

Product details

Management number 218472020 Release Date 2026/05/03 List Price $59.98 Model Number 218472020
Category
  • Real-Time GPS Tracking With 4G Cellular Coverage: Track vehicle location and status updates in real time using the Brickhouse Security tracking platform. The TrackPort Pro uses 4G cellular coverage across North America and provides location updates as frequently as every 5, 30, or 60 seconds depending on the selected service plan.
  • Hardwired For Continuous Power: Designed for permanent vehicle tracking, the Livewire Volt connects directly to your car battery for uninterrupted power. This hardwired GPS tracker eliminates the need to recharge batteries, making it ideal for long-term vehicle monitoring and fleet management.
  • Simple Two-Wire Installation: Installation is straightforward with a basic Two-Wire connection to the vehicle battery. Once installed, the device can be hidden under the hood or in another discreet location, providing covert vehicle tracking without bulky hardware.
  • Real-Time Alerts & Geofence Monitoring: Receive instant alerts for movement, speeding, and geofence events through the Brickhouse Security platform. Set custom zones and get notified when a vehicle enters or leaves specific areas to stay informed about vehicle activity. The Livewire Volt provides accurate location updates through the Brickhouse Security tracking platform, allowing you to view vehicle movement, trip history, and alerts directly from your smartphone, tablet, or computer.
  • 1-year Subscription Included: This GPS tracker includes a 1-year subscription to the Brickhouse Security tracking platform, giving you immediate access to Real-Time GPS tracking, location history, movement alerts, and customizable tracking updates. Monitor vehicles, assets, and equipment from your smartphone, tablet, or computer without additional setup.

Brand BRICKHOUSE SECURITY
Unit Count 1.0 Count
Manufacturer Brickhouse Security
Model Number Livewire Volt
BuiltIn Media SIM Card, Power Cable
Compatible Devices Personal Computer, Smartphone
Enclosure Material Plastic
Additional Features Geo-Fence
Warranty Description Lifetime Warranty
Supported Application GPS Tracking Apps, Real-time Tracking Tools
Connectivity Technology Cellular
Smart Home Compatibility Not Smart Home Compatible
Specific Uses For Product Vehicle Tracking

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.1 out of 5
★★★★★
23 ratings | 9 reviews
How item rating is calculated
View all reviews
5 stars
77% (18)
4 stars
7% (2)
3 stars
4% (1)
2 stars
2% (0)
1 star
10% (2)
Sort by

There are currently no written reviews for this product.